Dispatch audio
Heard on: Mississippi River Marine St Louis Area · 6 days ago
00:20
AI transcript
00:00
The mooring cell downstream of Lock 20 at mile 342.7 on the Upper Mississippi River is currently under construction and not available for use.
00:09
There are brackets around the perimeter that need to be removed, and rock placement around the base of the cell is not completed.