Traffic Slow Near Grindstone Pkwy Due to Construction, Columbia MO
Traffic is moving slowly near Grindstone Parkway because of earlier backup and ongoing construction, but the road has reopened.
Audio|Source: Missouri State Highway Patrol - Troop F
00:4
Transcript:
00:00
The roadway's back open.
00:01
The traffic is still going to be slow from the backup and the construction of down to 108.
Disclaimer:
This transcript was automatically generated and may contain inaccuracies. Please verify the information independently.
Location mentioned:
Grindstone Pkwy, Columbia, MO 65201
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect