Duamish river railroad bridge down for 10 minutes, King County WA


The Duamish River Railroad Bridge will remain down for 10 minutes, possibly delaying vessels moving on the river.
Audio|Source: Ballard Marine - Ch 13, 14 and 16
00:7
Transcript:
All vessels alleyway at the Duamish River, Seattle traffic chain. The Duolmish River Railroad Bridge will be in the down position for the next 10 minutes. All concerned trafficking.
All vessels alleyway at the Duamish River, Seattle traffic chain. The Duolmish River Railroad Bridge will be in the down position for the next 10 minutes. All concerned trafficking.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Duwamish River, Washington
Correct
Incorrect