Blocked chute causes snow operation delay near Pleasant St, Leicester MA
Please note:
This is not an official report. The headline and summary are generated by automated AI systems from public-safety dispatch audio. Always verify with official sources.
As discussed during the dispatch call, crews encountered a large salt blockage in a chute during snow removal operations near Pleasant St in Leicester. The blockage required dumping and reloading materials, causing temporary delays and possible hazardous driving conditions.
Audio|Heard on: Leicester Police Dispatch
Listen to dispatch call
01:18
Transcript:
00:00
Hey, copy that.
00:01
Were you able to get most of them or are you going to reload?
00:06
I got to go back and dump off.
00:08
There's a giant salt boulder blocking the chute, so I got to dump off and reload.
00:16
All right, copy that, buddy.
00:19
I got the ones off Rossin and Lillestrump.
00:26
Okay.
00:31
Did you know if it was the last one on Pleasant?
00:39
No,
00:40
It should be right across the street from Hillcrest Country Club.
00:43
That should be the last one.
00:50
Irwin, maybe.
00:58
Did you end up going down Holcomb?
01:03
Yeah, everything on the right side is all set.
01:06
All right, Roger.
01:09
You already hit that also?
01:12
Yeah, the first three on the left are done too.
01:16
Hey, copy that.
Disclaimer:
This transcript is automatically generated by AI from live dispatch audio. Dispatch communications may include background noise, overlapping speakers, or rapidly evolving situations, and automated transcription may not capture all details or context.
Location mentioned:
Pleasant St, Leicester, MA 01524
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect
Note:
Auto-generated from live dispatch audio, which may contain errors. Dispatch calls are not confirmed incidents. Always verify with official sources.