Track maintenance proceeds after third rail de-energized, Washington DC
Track maintenance is underway in Washington, DC, with staff authorized to replace safety equipment and proceed after confirming the third rail is de-energized. Safety checks and communication ensure the work can safely continue.
Audio|Source: WMATA MetroRail
01:2
Transcript:
00:00
Train ID (number withheld).
00:02
Train ID (number withheld), Norma. Try 4. I need you to do that. No time for me, please. Multi-level 1.
00:09
Over.
00:14
Next time.
00:17
Third rail head and energized.
00:19
That's such a no, you need final time change on page 63. How do you copy you?
00:23
How do you copy? Did the track again 16?
00:28
Track the 16 of them.
00:31
So the track and the 16 beat by the time. Third row part to unionize on my work on Texas. How do you copy?
00:37
Thank you for my copy. Third rail comb is energized in your work location.
00:42
Track you to 610.
00:48
Do you have permission to replace your remainder of your safety equipment and go to work?
00:55
Time now it's 1024 a.m.
00:57
Take you going to go to work. Okay.
01:00
Time now 1024 a.m. that's central and over you clear.
Disclaimer:
This transcript was automatically generated and may contain inaccuracies. Please verify the information independently.
Location mentioned:
Washington, DC